Project: I-CAVS     -     Entry

May 13, 2021 5 39-4 Control System Step 2-5 Category: Controls
Fabricated the F-1090 Elevator Pushrod (MID) cutting the aluminum tube to size and match drilling the ends with the template provided.
Primed internally and externally. Installed the VA-101 threaded ends and final riveting with pull rivets. Installed rod ends but i DIDNT put the safety wire.
Stored away for final installation.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.