Project: I-CAVS     -     Entry

Feb 15, 2021 1.5 39-6 Control System Step 1-2 Category: Controls
Fabricate the spaces F-1063C and drilled hole 1/8".
Preassembled the Elevator Idler arm with the spacer and the VA-146 Flange Bearing. Matchdrilled and final drilled with #30 for -4 rivets.
Primed the different parts and final riveting with AN470AD4-6 rivets.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.