Project: I-CAVS     -     Entry

Mar 26, 2021 6 39-7 Control System Step 1-3 Category: Controls
Spent more time setting up the rigs and the way of drilling than drilling the different parts. Due to a misalignment i had to replace one of the control sticks.
Matchdrilling done and final drilling completed.
Preliminary installation looks ok


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.