Installed hardware and all the parts according to the different instructions in section 39 in order to check for movement and potential interference with other systems / structure. I also verified alignment of the two controls stick using a small rig to check sticks are parallel.
result seems to be ok. Pending verification with Lucio and final installation (after final installation of fuel tubing and brake tubing.