Project: I-CAVS     -     Entry

Nov 21, 2021 3 32-4 Tailcone Attachment Step 3-7 Category: Fuselage
Made the shims as indicated using already primed .032 aluminum. Positioned after clecoing the Upper tailcone skin.
Matchdrilled with #40 the skin to the longerons and the baggage side bottom and triangle holes.Matchdrilled all the tailcone bottom and top skin into the fuselage skins, longerons and F-1006ABCD bulkheads. Matcdrilled the forward line of rivet on the belly into the F-1006B.
MACHINE COUNTERSINKING NOT DONE YET.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.