Project: I-CAVS     -     Entry

Dec 02, 2021 3 33-3 Baggage Area step 1-10 Category: Fuselage
Final drilled and dimpled the baggage door shims. Clecoed the lower baggage door channel in position. Trimmed the upper baggage door seal channel and checked in position. Final drilled #30 the holes in the bulkhead in in the close out panel.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.