EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
- Entry
Date:
Dec 02, 2021
Hours:
3
33-3 Baggage Area step 1-10
Category: Fuselage
Description:
Final drilled and dimpled the baggage door shims. Clecoed the lower baggage door channel in position. Trimmed the upper baggage door seal channel and checked in position. Final drilled #30 the holes in the bulkhead in in the close out panel.
No Pictures found for this entry
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.