Project: I-CAVS     -     Entry

Apr 10, 2022 1 30-3 Step Installation Step 1-5 Category: Fuselage
Checked quick build. Final drill #12 in the step has been done during quick build.
Checked distance as indicated in the KitInstruction, however the distance on the step LEFT is 46 inches instead of 45 1/4" Need to check when plane will be sitting on his wheels and overall set up.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.