Project: I-CAVS     -     Entry

Apr 10, 2022 2 43-9 Cabin Cover step 3-5-6 Category: Fuselage
Cut the spacers, final drilled 5/6" into the cabin cover. Lucio has been able to correct the initial holes, as they were not perpendicular to the inside cabin cover resulting in a an optically not perfect result.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.