Project: I-CAVS     -     Entry

Apr 14, 2022 3 33-8 Baggage Area step 1-7 Category: Fuselage
Clecoed all the floor panels, side panels, door close out and seal channels to the F-1006 Bulkhead and to the longerons.
Matchdrilled the right side panel F-1080 into the floor panels, into the F-1006 Bulkhead and into the fuselage longerons. Clecoed the corrugated panel and matchdrilled into the F-1006 Bulkhead with #19 drill.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.