Project: I-CAVS     -     Entry

Jul 09, 2022 2 39-8 Control System step 1 Category: Fuselage
Reviewed preliminary installation and final torqued the AN3 nuts. Marked the torqued nuts in YELLOW. Cotter pins need still to be installed