Project: I-CAVS     -     Entry

Aug 26, 2022 6 45-6 Cabin Doors and Transparency Step 3A-3d Category: Fuselage
Final trimming for the canopy. Slightly enlarged the holes in the reinforcement plates for the bolts. Tested again the fitting (total 4 times).
Mixed epoxy and flox and applied to the bottom reinforcement plates of the canopy and of the doors (not sure is necessary, but is not a big deal). I also primed the shims and installed below the door back hinge on the left door.
with the excess epoxy i filled few imperfections on the left door.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.