Project: I-CAVS     -     Entry

Aug 30, 2022 5 45-12 Cabin Door and Transparencies step 1-5 Category: Fuselage
Preparation of the forward and aft pin blocks. Adapted to size. After receiving the Planearound blocks i adapted the blocks, but the result is not satisfactory due to misalignment of the holes. Adapted the blocks using the mill to accomodated the socket wrench. Still not happy with result, but for temporary solution it will work.
Match drilled and countersunk all the holes.

No Pictures found for this entry