Project: I-CAVS     -     Entry

Oct 23, 2022 16 45-7 Cabin Doors and Transparency Step Build Up Flanges Category: Fuselage
Building up flanges to allow proper compression of the McMaster seal. Right door required more work as i sanded too much when fitting the door. Used sacrificial McMaster seal filled with epoxy and flox to build up and provide adequate thickness for the seal to have a nice grip. Few round required for the right door. Left door looks better.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.