Project: I-CAVS     -     Entry

Oct 20, 2022 4 45-17 Cabin doors and transparencies Planearound External Handle Category: Fuselage
Installation of the racks. Removed the latch mechanism, installed the racks after removing the LP4-3 pop rivets. Installed racks with temporary pin safetying. Several attempts to get the proper clocking, but at the end the result is more than satisfactory. Only thing is that sometimes the pins stick out and interfere with the door inboard wall. I think i will cut the door wall to allow operation and prepare a cover wich allows for he pin movement. I found also a solution to put a very small washer on the pin (hole side) to avoid the sticking out.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.