Project: I-CAVS     -     Entry

Dec 16, 2022 6 45-13 Cabin door and transparencies Conduit Category: Fuselage
I had to remove all the work done to run the conduit along the cabin top forward struts as it didn't fit well with the overhead console. I removed everything with the oscillating tool, sanded away all the epoxy and foam and reinstalled smaller conduit (16mm). Glued with rapid epoxy to keep in place.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.