EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
- Entry
Date:
Feb 18, 2023
Hours:
4
45-14 Cabin doors and transparencies Planearound Door Latch
Category: Fuselage
Description:
Installare Planearound Door Pins and door Pins Guides on both doors. I had to trim a bit the aluminum tubes. The guide bolt holes needed some elongation in order to align the pin holes, but at the end the result is satisfactory.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.