Mar 05, 2023 2 29-10 New Landing Gear Service Bulletin SB00007 Category: Landing Gear
Countersunk the three rivet holes on both sides in order to allow double flush rivet installation. Installed the double flush rivets on both sides.
Installed the doubler on the right side, checked alignment of the bottom four holes, match drilled all the #30 holes. deburred all the holes. Unfortunately a bad drill bit created few oblonged holes in the doubler.