Project: I-CAVS     -     Entry

Apr 18, 2023 4 firewall Insulation Category: Firewall
Prepared the two fiberfrax parts and cut the right foil. several attempts to fit and trimmed. Glued the foil to the fiberfrax right side and positioned on the firewall. Used masking tape to hold in position. Marked the holes and cut the holes with a cutter. deburred and reinstalled the brake reservoir and the air valve (right).
Blood tribute paid to the God of Steel.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.