Project: I-CAVS     -     Entry

Sep 21, 2023 3 51 FF1_10-2 Engine Installation step 1-5 Category: Engine
Assembled the oil cooler support, final drilled, dimpled, deburred all the holes. Little adjustment necessary to install on the predrilled firewall holes.
Riveted the parts together.
Riveted to the firewall.
Drilled 4 holes to secure fiberfrax/steel sandwich to the interior of the cooler.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.