Project: I-CAVS     -     Entry

Oct 10, 2023 3 firewall Insulation Category: Firewall
Cleaned the firewall and the fiberfrax halves. Final trimming of the fiberfrax halves. Positioned the right half and glued to the firewall. Positioned the left half and trimmed. Used spray glue to position the left fiberfrax. Lucio drilled holes for the oil recess fiberfrax angles after checking proper fitting. Deburred holes.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.