Project: I-CAVS     -     Entry

Oct 12, 2023 4 Firewall Insulation Category: Firewall
Final installation of the fiberfrax panel.
Cleaned the steel foil, used firebarrier2000 to create a fillet around the firewall perimeter and around the engine mount. Used wooden bars to keep the fiberfrax/steel foil attached to the firewall.
Prepared the Steel Eyeball passthrough for the 4 bowden cables (drilled to the right diameter for each passthrough).
Modified the steel cabin air vents installing a nut plate on each valve to simplify installation of the cable clamp.