Project: I-CAVS     -     Entry

Dec 07, 2023 2 FF2-4 Cowl Baffles step 7-11 (missing riveting Category: Engine
Matchdrilled and disassembled all the parts, deburred edges and holes. Positioned the CB-1005B Oil Cooler Brace and drawn a rivet line parallel to the lower edge of the cylinder 6 aft baffle. Removed all parts, final drilled #12.
Overall view of the left side engine baffles, #6, #4 and #2 from left to right


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.