Project: I-CAVS     -     Entry

Jan 27, 2024 5 50-3 cabin heat and ventilation step 1 Category: Interior Finish
prepared 8 little aluminum backing triangles to be drilled and tapped for #8 screws.
A lot of filing and trimming.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.