Project: I-CAVS     -     Entry

Jan 29, 2024 3 50-3 cabin heat and ventilation step 1 Category: Interior Finish
Drilled the NACA air vent flange for the flush rivets needed to fasten the backing gussets. Drilled #28 the gusset and tapped tor #8 screws. Primed all the gusset and riveted the gusset to the right NACA air vent. Painted RAL 7016 the right vent.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.