Project: I-CAVS     -     Entry

Jan 30, 2024 2 50-3 cabin heat and ventilation step 1 Category: Interior Finish
Preparation of the last two gusset for the left air vent. drilled, primed and riveted to the Naca-Vent flange. Tapped the gusset. Final paint with RAL7016


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.