EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
I-CAVS
- Entry
Date:
Feb 07, 2024
Hours:
2
43-8 Cabin Cover step 5-7
Category: Fuselage
Description:
scuffing cabin top flange in preparation of rebuilding of fiberglass in order to have 1/4" for the plexiglas + 1/8" for the sikaflex.
Positioned adhesive plastic to contain the resin and flox rebuilding of the top cabin flange
No Pictures found for this entry
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.