Project: I-CAVS     -     Entry

Feb 12, 2024 1 39-4 Control System Step 1 Category: Controls
Preparation of safety wiring for F-1089 forward. Not clear why this is necessary. Checked again position, length and correct positioning of the different bearings.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.