Lifted the fuselage using the small crane. Positioned both gear legs. Difficulties on the left side due to the powder coating making impossible to insert to final position. Sanded away part of the powder coating. Inserted and positioned using smaller drill bits (back side) until 7,9MM back of the drill bit could be inserted. Final drilled with 7.9 mm drill. Used the 0.311" reamed for finishing step.
Done on both sides.