Modified and sanded the left door hinge cover.
sanded right door to get a 2.5mm gap on the bottom of the door
Countersunk the open holes on the side skins around the door opening. They have been used to form the doors, but there is no indication in the kit instruction on how to deal with these holes. This step has not been done in the Quickbuild phase and i didn't realize that Section 29-14 step 9