Project: I-CAVS     -     Entry

Mar 19, 2024 2 45-7 Cabin Doors and Transparency Step Build Up Flanges Category: Doors
sanded left door bottom side. Used epoxy and flox to have a better transition between fuselage and door (bottom was sitting proud 2 mm).

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.