Project: I-CAVS     -     Entry

Mar 20, 2024 2 45-7 Cabin Doors and Transparency Step Build Up Flanges Category: Doors
sanded left door opening flange. Used again epoxy and flox to smooth out transition and straighten the door opening.

Painted with matt transparent the right carbon fiber on the door opening.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.