Project: I-CAVS     -     Entry

Mar 25, 2024 3 45-7 Cabin Doors and Transparency Step Build Up Flanges Category: Doors
some more work on the door opening. Epoxy and flox to smooth out transition between fuselage and door (right proud).
Used some flox to fix one of the two forward interior panel


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.