Project: I-CAVS     -     Entry

Mar 30, 2024 1 FF1_10 Engine Installation Category: Engine
Installed the firewall passthrough. Reinstalled one of the shunt as it was mounted upside down. Checked firmness of all components. Installed the steel shield for the air control cables. Installed all the screws in the eyeballs passthrough.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.