Project: I-CAVS     -     Entry

Apr 02, 2024 2 37-7 Fuel System (Andair Valve Installation) Category: Fuel System
Measured and cut the extension. Drilled the connectors and inserted the safety pins. Drilled the holes on the tunnel cover. Some difficulties to have a somehow symmetric look considering that the backplate holes are not symmetrical in order to avoid wrong installation.
Temporary installation with two steel screws....need to acquire longer ones or to replace with aluminum screws or standard cadmium screws.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.