EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
MikeYRansS21
- Entry
Date:
May 04, 2022
Hours:
3.5
Tbi controls
Category: Engine
Description:
Mount throttle, primer lever, intake plenum. Then mount tbi to engine. Add primer cable mount standoff to wastegate. Enlarge prop control head panel hole from 2.0625 to 2.25" diameter.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.