Project: Sport     -     Entry

Apr 22, 2020 6 Finished installing elevator trim cable. Completed final assembly of tail section. Installed spar guide blocks and adjusters. Installed flap detent plate. Category: Controls
Finished installing elevator trim cable. Completed final assembly of tail section. Installed spar guide blocks and adjusters. Installed flap detent plate.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.