Project: S-21     -     Entry

May 24, 2020 5.5 Tail pull handle and Horizontal Stabilizer frame Category: Empennage
Measured, cut and joined the two tubes that form the tail lift/pull handle before starting horizontal stabilizer. A light coating of J.B. Quick was used.

Gathered all parts for the horizontal stabilizer frame, pressed bushings into elevator hinges, fluted the ribs to remove bowing, cleco the entire frame and begin riveting.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.