Project: S-21     -     Entry

Mar 06, 2023 5 Cooling baffles Category: Engine
Worked on cooling baffles (aluminum framing only, no seal material) most all day. Primarily working on inlet floors on both sides of the flywheel. Riveting doublers and adding support angles to ties the inlet ramps to the side baffling. Guess I also attached the baffle pieces that wrap around the cylinder barrels and heads. Also riveted in the cabin heat air pull off into the right side cooling entrance.