Project: S-21     -     Entry

Dec 20, 2020 3 Rudder cable system Category: Controls
Installing the rudder cable system per manual before the top skins go onto the tailcone. Including fitting the exit fairings for the rudder cables.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.