Project: Voltar-S21     -     Entry

May 26, 2020 3.5 Completed installation of R wing tank and installed L wing tank into wing. Category: Wings
Needed to slightly reshape the openings in the root rib to accommodate the sight gauge fittings. Installed plastic sight gauge fuel lines onto both wings. Began deburring Rudder parts.