EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Voltar-S21
- Entry
Date:
Oct 04, 2023
Hours:
3.5
Oil Door
Category: Engine
Description:
Riveted oil door assembly and attached to upper cowl using both NAS1097 and AN426 rivets. Adjusted fit by bending hidden hinge curved flange to close the gap between the door and the cowling. Filled rivet head rims with JB Weld.
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.