Project: Voltar-S21     -     Entry

Oct 14, 2023 4.5 R Wing Category: Wings
Prepped R wing for installation: wet riveted inspection plate doubler rings in place with CCC-42 (flush) rivets. Carefully measured, then used die grinder/cutting disc to trim R T-bone attachment and primered cut surfaces. 1.0 hrs assitance from R. Prior.

No Pictures found for this entry

NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.