Project: dhhVolksplane     -     Entry

Mar 15, 2020 test positioning Category: Fuselage
March 15 - 29, 2020 This week I set up a centerline down the length of the workbench. Positioning the bulkheads F3 and F4 on the table I saw that I never drilled the holes for the bushings. I thought I would get these by now from Fritz Wagoner. But either way I realized that next week I would have to drill these holes on the drill press. I set the bukheads up and positioned the left and right sides together with clamps.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.