Project: RickWeiss     -     Entry

Oct 19, 2023 4.0 Cowling Category: EXP-119
Slowly, and I mean slowly, work continues on the cowling. That being said, today was a good one for progress. The upper cowling had two Skybolt fasteners installed to sort of secure the cowling in place while the lower cowling was trimmed even more to now fit flush with the forward skins. The big trim was the upper/lower mating surface. The lower cowling was trimmed to be flush with the upper cowling and soon it will be trimmed to have an acceptable gap for painting.