Project: allenthoe     -     Entry

Jun 25, 2021 28 Section 26 part 3 Category: Fuselage
Riveted the seat belt attach lugs to the baggage ribs. Added the routing angles in center for the systems.

Attached the F-01405 (first part in done insection 25) bulkhead and bulkhead angles to the assembly.

Did a lot of dimpling for the nut plates on the ribs as well as all of the bottom #40 holes where it will mate with the skin.

Did NOT install nut plates here. Looked ahead in the plans and there are some that come in later but a lot of them do not appear to have nut plates deep into this build. All keep you posted when the nut plates go in (so far plans only have me rivetIng the nut plates in the ramp of the ribs.

***NOTE*** There was one bolt on the outboard bulkhead from the previous section that I noticed called for 2 washers (bolt-washer-bulkhead-doubler-washer-nut) where the others did NOT include a washer between the bolt and the bulkhead. However, if you do this you will need to upsize the bolt to an AN-14A instead of the AN-13A per the directions as you will not have enough protrusion to be sure the nut is gripping the bolt. (See image)

The fuselage is beginning to look like a big piece of the airplane!