Project: KMYARV12     -     Entry

Dec 06, 2020 3 Worked on multiple parts Category: Empennage
Stabilator Team: Riveted all the ribs on and prepped the coverings (deburred them) and clecoed them for riveting next time. (image below)
Tail Cone Team: Put the stiffener in and riveted their first stiffener. (image below)
Rudder Team: Got the fiberglass farings (cover caps on the ends of the vertical stabilizer) to fit properly in the vertical stabilizer. Ready to rivet it and assemble with rudder.
Larry: We are going to expand to the fuselage and combine these parts to start assemble things.
Programming/Management Team: Continued work on programming. Plans on adding a master file that will save all parts and make the old system void. Plans on meeting over Christmas meeting.

Multiple people took photos. Thanks!