Project: KMYARV12     -     Entry

Dec 29, 2020 8 Inventory and crates unpacking Category: Empennage
We met at Larry's hanger, inventoried every part atleast twice, and then drove them to HUHS. Each part was put in a container, with ALL other parts that are within that section. For example all parts relating to the stub spar assembly section 14, were all stored in the same box. This will make it easier when we start assembling the parts. The parts were not logged on a ledger.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.