Project: KMYARV12     -     Entry

Oct 24, 2021 3 Canopy and controls Category: Workshop
The canopy was screwed to the rear and side frame.
The flapperon and control stick pushrods were sanded, prepped and primed. We need to reinstall the rod ends with FOUR rivets rather than two at each end.
The engine wires and safety wiring was completed. It took 6 tries but we learned the proper technique from reviewing AC-43.
Harsh completed the wing root electrical connector attachment.


NOTE: This information is strictly used for the EAA Builders Log project within the EAA organization.     -     Policy     -     © Copyright 2024 Brevard Web Pro, Inc.