Project: KMYARV12     -     Entry

Oct 31, 2021 3 10/31/21 Category: Workshop
Flight controls were installed by Garrett, including the flapperon control arms as well as the elevator wheel cables. Harsh and Willem set up flight simulator and fixed their mistake where he did not cut the slit in an electrical grommet. Mentors continued organization. Addison encountered problems installing the canopy handle, but eventually got the handle primed and painted and ready for install. Brady worked on installing the servos necessary for the autopilot, he installed it on the left flapperon torque arms. Richard began installing the radiator but encountered issues locating the appropriate hardware in order to install. Maggie worked on fabricating hardware in order to attach the upper/lower cowling.