Nov 14, 2021 3 Sunday Session Category: Workshop
Garrett re-routed elevator cables around the pulleys in the cockpit which had been incorrectly routed. He installed the ADSB unit on the rear bulkhead and antenna on the tailcone. Adam temporarily attached the rudder cables at the pedals for fitting, and he helped with the cowlings. Addison and Richard rough cut the cowling and began finish sanding the edges. Harsh routed the dome light wires through the roll bar. Willem helped Dan and Wayne disassemble the C65 Cub engine which is now ready for removal. Logan finished zip tying the ELT wires.

Steve Krog provided ground school for Willem, Logan, Addison and Taylor. He provided simulator missions for Adam, Richard and Harsh to practice.